Search
Confirm
Cancel
Gocom

Gocom Projects

Location:
Homepage
/
/
/
Experimental study on the old shandong penglai xin crown tail pillar leaching mi
q28
q28

Experimental study on the old shandong penglai xin crown tail pillar leaching mi

Summary: Black, non-ferrous metals, gold mine engineering design, consulting, construction supervision, project contracting, gold mining, automation control, electrical products processing, mining, dressing and smelting research and development
key:Consulting & Desigh Engineering Services
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
0
Contact Us

Address:No.18 Xuefu West Road,High-tech District,Yantai,Shandong,China

Tel: +86-535-6857870(Operation) +86-535-6857866(Office)

Fax: ytjinjian@126.com

Details

Samples from Penglai Xin crown Mining Company Limited, in 2013 at the end of 12 to build the engineering design Co. Ltd. Institute of mining and metallurgy laboratory. Penglai Xin crown Mining Co. Ltd. old tailing samples in some years the backlog of tailings of refractory mineral tailings, the average gold, silver 1.2 x 10-6  trace arsenic, sulfur 0.425%; 0.056% lower. The size distribution is not uniform, the content of -0.076mm (-200) level and above accounted for 65.26%, -0.038mm (-400) level content accounted for 39.23%, of which -0.018mm (-800  mesh) accounted for 29.9%, indicating more mud samples. A fine gold veins and veinlets disseminated distribution in quartz vein fissures or pyrite sericite quartz rocks, long-term accumulation of mud, weathering, serious oxidation. After re-election, flotation, cyanide (leaching and column leaching), beneficiation test research, the cyanide leaching process of gold recovery, the highest recovery rate. The old tailings grinding -200 reached 79.5%, two and two after a roughing finishing process closed-circuit flotation test, get the gold grade of concentrate of 13.20 * 10, the gold recovery rate of 33.54% results.

The old mill tail ore samples by 85.5% -400 mesh, the cyanide leaching, the leaching rate of gold reached 70.83%; laboratory column leaching, the leaching rate of gold reached 60%.

Related Projects

Name

Mineral separation automatic control system with complete flow of Dunhua Tadong

Name

Xindigou gold deposit in main shaft of 800KW electric control system of Inner Mo

Name

Rongguan industrial group mining main shaft hoist electric control system of 900

Name

Longqiao iron mine new main shaft 2800kw high voltage frequency conversion synch

Feedback

Description:
验证码

Links:Jinjian Engineering Design Co., Ltd.

Gocom Group

Address:No.18 Xuefu West Road,High-tech District,Yantai,Shandong,China

Tel:86-535-6857870(Operation) 86-535-6857866(Office)

Fax:86-535-6857877(Office)

Mailbox:ytjinjian@126.com

Gocom Group

Mobile QR code

Gocom Group