Search
Confirm
Cancel
Gocom

Gocom Projects

Location:
Homepage
/
/
/
Shandong dongping liang lin iron ore dry polishing test
q5
q5

Shandong dongping liang lin iron ore dry polishing test

Summary: Black, non-ferrous metals, gold mine engineering design, consulting, construction supervision, project contracting, gold mining, automation control, electrical products processing, mining, dressing and smelting research and development
key:Consulting & Desigh Engineering Services
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
0
Contact Us

Address:No.18 Xuefu West Road,High-tech District,Yantai,Shandong,China

Tel: +86-535-6857870(Operation) +86-535-6857866(Office)

Fax: ytjinjian@126.com

Details

The ore minerals are mainly magnetite, containing a small amount of hematite, limonite, pyrite, chalcopyrite and occasionally. Gangue mineral is quartz, plagioclase, hornblende, biotite, followed by calcite, epidote, zircon, apatite and other rare. The useful ore were divided into magnetite, no other significant associated components found. The main purpose of mineral magnetite is black, mostly, euhedral subhedral granular aggregates. The particle size is 0.05 ~ 0.3mm, part of a giant crystal shape, particle size of more than 1mm. A strip, striped nearly parallel arrangement, orientation is obvious, a small amount of disseminated. A small amount of hematite and magnetite with particle size distribution, generally 0.1 ~ 0.50mm; the fracture surface along the limonite ore locally distributed, brown, small grain. The main purpose of the relationship with the mineral hornblende closely is hypautomorphic granular, columnar, and most are magnetite and magnetite with metasomatic filling, banded distribution, particle size of 0.3~0.6mm. Oretype is required to select a weak magnetic iron ore. The test chamber will be iron ore samples from mixing, dividing, sampling with TFe:21.65%, MFe:15.32%.

The entrusted by the owner, through the dry magnetic separation test (magnetic field intensity were 5000, 5500, 6000, 6500, 7000Oe), visits Dongping lianglin iron ore dry polishing feasibility test.

By using the 5500Oe test in the dry polishing, TFe:21.65%, MFe:15.32%, get dry polishing concentrate grade TFe:23.98%, MFe:19.64%, TFe:6.77%, MFe:0.55% grade of tailings dry polishing, discard rate reached 23.42%. Greatly reduce the grinding ore quantity, and provide basic data for the late plant transformation process. In order to make full use of resources, expand production capacity, the purpose of lowering the efficiency.

Related Projects

Name

Mineral separation automatic control system with complete flow of Dunhua Tadong

Name

Xindigou gold deposit in main shaft of 800KW electric control system of Inner Mo

Name

Rongguan industrial group mining main shaft hoist electric control system of 900

Name

Longqiao iron mine new main shaft 2800kw high voltage frequency conversion synch

Feedback

Description:
验证码

Links:Jinjian Engineering Design Co., Ltd.

Gocom Group

Address:No.18 Xuefu West Road,High-tech District,Yantai,Shandong,China

Tel:86-535-6857870(Operation) 86-535-6857866(Office)

Fax:86-535-6857877(Office)

Mailbox:ytjinjian@126.com

Gocom Group

Mobile QR code

Gocom Group